皇冠博彩app
热门标签

环球ug代理开户(www.ugbet.us):Fukushima debris removal delayed by another year

时间:1个月前   阅读:4

环球ug代理开户www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠开户平台www.hg9988.vip)是皇冠官方开户平台,开放皇冠信用网代理申请、信用网会员开户,线上投注的官方平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:哈希竞彩游戏源码出售:Bursa rises cautiously ahead of Jackson Hole meet

下一篇:ug官方网站(www.ugbet.us):Aaron-Wooi Yik storm into World Championships final

网友评论